Project Gallery

 

Old State Road Improvements Phase 1

  • From Akron Road south to the Reservoir Driveway, City of Norwalk
  • Estimated Construction Cost:   $ 356,000 ±

 

 

Old State Road Improvements Phase 2

  • From Akron Road south to the Reservoir Driveway, City of Norwalk
  • Estimated Construction Cost:   $ 600,000 ±

 

Scope of the Above Two Projects:

  • Phase 1: Design plans for lane widening, new curb, new storm, and intersection improvements.
  • Phase 2: Design plans for lane widening, new curb, new storm sewer, guardrail placement, and resurfacing.‚Äč

→      Contractors Design Engineering (CDE) designed pavement widening, intersection improvements and storm sewer for drainage improvements. CDE was the lead design engineer for these projects and in charge of preparing both the Preliminary and Final Design Documents.  During construction, CDE provided Construction Layout Staking that was required by the contractor for construction of the site. Phase 1 was designed in 2016 and constructed in 2017. Phase 2 was designed in 2017 and constructed in 2018.

 

City of Norwalk Waterline & Sewer Projects

  • Indian Terrace Drive Water Main Replacement (2018)
  • Valley Park Drive Water Main Replacement (2017)
  • Rosedale Boulevard Water Main Replacement (2016)
  • Milan Avenue Water Main Replacement (2015)
  • Wooster St. /Marshall St. San. Sewer Separation Phase 1-6 (2012-2018)
  • West Main Street Water Main Replacement (2011-2012)
  • Benedict Avenue Water Main Replacement (2011)-Design only
  • West Seminary Street Water Main Replacement (2010)
  • Williams Street Sanitary Sewer (2008)
  • Ford Avenue Water Main Replacement (2008)
  • Glover Avenue Water Main Replacement (2008)
  • Norwood Avenue Water Main Replacement (2008)
  • Bank Street Water Main Replacement (2007)

→      Contractors Design Engineering (CDE) has been associated with many of the City of Norwalk’s waterline projects throughout the years.   For many of the projects listed above, CDE completed the initial surveying by obtaining the topography of the site and establishing both horizontal and vertical control points throughout the project’s site.  CDE was the lead design engineer for these projects and in charge of preparing both the Preliminary and Final Design Documents, preparing the Bidding Documents, and assisting during Bid and Contract Preparation.  During construction, CDE provided the Inspector for many of the projects listed above.

→ The City of Norwalk has hired Contractors Design Engineering more than 40 times, for various engineering & surveying projects since 2007 alone. 

 

East Main Street Improvements Phase 1-4

  • City of Norwalk
  • Completed: 2009-2014
  • Construction Cost:

Ph. 1-$580,000 +/-,            Ph. 2 $510,000 +/-, 

Ph. 3-$516,000 +/-,            Ph. 4- $525,000±

Scope of Project:
  • Removal of Old Trolley Rails located beneath Existing Pavement
  • Replace Waterline(Phase 1-2)
  • Upgrading of Existing Storm Sewer
  • Full Depth Pavement Reconstruction (Phase 1)
  • Curb Reconstruction
  • New ADA Compliant Curb Ramps

→      Contractors Design Engineering (CDE) completed the initial surveying for this project by obtaining the topography of the site and establishing both horizontal and vertical control points throughout the project’s site.  CDE was the lead design engineer for this project and in charge of preparing both the Preliminary and Final Design Documents, preparing the Bidding Documents, and assisting during Bid and Contract Preparation.  During construction, CDE provided an Inspector for the project and all Construction Layout Staking that was required by the contractor for construction of the site.

 

City of Willard Engineering Consultant (2007-2010)         

→      From 2007-2010, Contractors Design Engineering, primarily Donald E. Weaver, held the position as City Engineer for the City of Willard.  As City Engineer, Don worked out of the City of Willard Engineering Office two days a week and oversaw all the day-to-day engineering responsibilities of the city.  While holding the office of City Engineer for the City of Willard, Don oversaw many projects, which were designed “in-house”, such as the Myrtle Avenue Reconstruction Project, Myrtle Avenue “Downtown” Pavement Improvement Project, Willard Soccer Complex, Bullhead Road Water Main Project, Dale Avenue Water Main Project, and the Pearl Street Water Main Replacement Project.

 Myrtle Avenue Downtown Project

 Myrtle Avenue Downtown Project

 

Stamped Asphalt used on Myrtle Ave.

 

 Myrtle Avenue Downtown Project